Set Appliance State:
Gas Off
| Isolate Mains Power to appliance as per TOPs P4 |
CH Demand
Gain access to PCB (use insulation mat as required)
Pull connectors X1 and X2 back slightly to expose test points
Pull connectors X1 and X2 back slightly to expose test points
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Measurement:
Reset appliance as necessary.
Measure the voltage between pin 4 (brown) on X2 to pin 2 (blue) on X1 at the PCB.
At 15 second intervals mains voltage should be measured
for 3 seconds as power is sent to the spark generator, this
will be repeated 5 times until lockout occurs.
Is the voltage measured as expected?
Notes:
1. Timings quoted are approximate.
2. Reset appliance and repeat test as necessary until outcome is determined.
Measure the voltage between pin 4 (brown) on X2 to pin 2 (blue) on X1 at the PCB.
At 15 second intervals mains voltage should be measured
for 3 seconds as power is sent to the spark generator, this
will be repeated 5 times until lockout occurs.
Is the voltage measured as expected?
Notes:
1. Timings quoted are approximate.
2. Reset appliance and repeat test as necessary until outcome is determined.

Isolate as per TOPs P4
and refit as necessary