Set Appliance State:

Mains Power Off
Ensure there is no demand for either CH or DHW
Selector switch to in ON position
WARNING! - Mains voltage is expected during test follow
TOPs P4 live testing procedure
Mains Power On

Observation:

When power is turned on time the fan should run and approximately 5sec after the pump should also run.
If there is no request for any form of heating after 20sec the pump will stop and the
display will show 0 indicating the boiler is in standby awaiting a request for heat.
The fan will continue to run after self check is complete, for a total of 4min.