Set Appliance State:
| Isolate Mains Power to appliance as per TOPs P4 |
CH Demand
Gain access to mains terminal strip, use insulation mat as required
Boiler Thermostat in its '0' position
Boiler Thermostat in its '0' position
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Measurement:
Measure the voltage between the pump overrun thermostat common connection spade connection with white and blue wires to the Neutral (Blue) wire marked MAINS (N) on the main connector block.

Isolate as per TOPs P4
and refit as necessary