Set Appliance State:
CH Demand
Boiler CH thermostat setting to MAX
Gas On
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Observation:
Reset appliance if required.
(press and hold the reset button for 4 seconds then release)
Allow fan to run.
Listen to the appliance and observe the display.
Approximately 5 seconds after the fan begins to run the burner should ignite and establish, this is indicated by the flame symbol appearing permanently in the display and the radiator symbol flashing.
(press and hold the reset button for 4 seconds then release)
Allow fan to run.
Listen to the appliance and observe the display.
Approximately 5 seconds after the fan begins to run the burner should ignite and establish, this is indicated by the flame symbol appearing permanently in the display and the radiator symbol flashing.