Set Appliance State:
| Isolate Mains Power to appliance as per TOPs P4 |
CH Demand
Hinge down the PCB housing
Reset lockout as necessary
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Measurement:
Allow ignition sequence to commence and sparking heard.
Measure the voltage on the red wire and the adjacent black wire at the 6 way connector at the top of the PCB housing.
Expect approximately 215V DC.
WARNING!
Sparking will occur during the test. Ensure hands are kept well clear of the
spark lead.
Measure the voltage on the red wire and the adjacent black wire at the 6 way connector at the top of the PCB housing.
Expect approximately 215V DC.
WARNING!
Sparking will occur during the test. Ensure hands are kept well clear of the
spark lead.

Isolate as per TOPs P4
and refit as necessary