Set Appliance State:
DHW Demand
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Measurement:
Approximately 5-10 seconds after power is restored to the appliance mains voltage should be present between pin 3 (blue) and pin 4(brown) of connector X3 at the main PCB.

Isolate as per TOPs P4
and refit as necessary