Set Appliance State:
| Isolate Mains Power to appliance as per TOPs P4 |
CH Demand
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Measurement:
Measure voltage across the terminal marked optional pump feed (live) and terminal marked N (neutral) on the mains input connector block.
240VAC expected.
240VAC expected.

Isolate as per TOPs P4
and refit as necessary