Set Appliance State:
| Isolate Mains Power to appliance as per TOPs P4 |
Carefully remove the electrode assembly from the combustion box door
Measurement:
Inspect the electrode for damage and good general condition.
Also measure the resistance between the tip of the spark electrode and the lead connection point.
Expect continuity / zero resistance.
Note:
Before reassembly check the integrity of all disturbed gaskets and seals and replace as necessary.
Also measure the resistance between the tip of the spark electrode and the lead connection point.
Expect continuity / zero resistance.
Note:
Before reassembly check the integrity of all disturbed gaskets and seals and replace as necessary.

Isolate as per TOPs P4
and refit as necessary