Set Appliance State:
| Isolate Mains Power to appliance as per TOPs P4 |
CH Demand
Locate the external pump
Remove the Cover from the Pump
Remove the Cover from the Pump
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Measurement:
Measure voltage to the external pump.
Mains voltage expected.
Mains voltage expected.

Isolate as per TOPs P4
and refit as necessary