Set Appliance State:
Mains Power Off
CH Demand
| WARNING! Mains voltage is expected during test, follow TOPs P4 live testing procedure |
Observation:
Reset boiler as required.
Place a demand for central heating, ensure all controls are
calling for heat and the user control is turned up.
Does the pump start and run correctly?
Note:
Before continuing please ensure the pump is connected to the boiler's pump feed terminal.
According to the boiler's Installation Instructions the pump MUST be wired back to the boiler.
This is so the boiler's pump over run can dissipate residual heat after a demand to prevent possible over heating and/or noise problems.
Place a demand for central heating, ensure all controls are
calling for heat and the user control is turned up.
Does the pump start and run correctly?
Note:
Before continuing please ensure the pump is connected to the boiler's pump feed terminal.
According to the boiler's Installation Instructions the pump MUST be wired back to the boiler.
This is so the boiler's pump over run can dissipate residual heat after a demand to prevent possible over heating and/or noise problems.