XSol Diagnostic System
Home
← Back
INTERNAL FUSE
Set Appliance State:
Isolate Mains Power to appliance as per TOPs P4
Set Multimeter to Resistance
Remove the fuse from the boilers main terminal strip
Measurement:
Measure the resistance across the fuse.
CONTINUITY / ZERO RESISTANCE MEASURED ACROSS THE FUSE
OPEN CIRCUIT MEASURED ACROSS THE FUSE
After test don't forget
Isolate as per TOPs P4
and refit as necessary
Isolate as per TOPs P4
and refit as necessary