Set Appliance State:

Isolate Mains Power to appliance as per TOPs P4
Set Multimeter to AC Volts Set meter to measure AC Volts
DHW Demand
Gain access to PCB (use Insulation Mat as required)
WARNING! - Mains voltage is expected during test follow
TOPs P4 live testing procedure
Mains Power On

Measurement:

Measure the voltage between pins 1 and 2 (leftmost brown and blue) wires of X3 on the main PCB.
During the sparking stage of the ignition sequence mains voltage should be present.
Note:
Boiler will attempt to light three times before lockout.
Reset as required until test is complete.