Set Appliance State:
| Isolate Mains Power to appliance as per TOPs P4 |
CH Demand
Gain access to mains terminal strip, use isolation mat as required
Boiler Thermostat in its '0' position
Note:
The voltage measurement points for this test will vary depending on which type of system the appliance is used with
Boiler Thermostat in its '0' position
Note:
The voltage measurement points for this test will vary depending on which type of system the appliance is used with
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Measurement:
FULLY PUMPED SYSTEM
Measure the voltage across the room thermostat connection marked MAINS SwL (Brown) and the Neutral marked MAINS N (Blue) on the main connector block.
GRAVITY DHW SYSTEM
Measure the voltage across the room thermostat connection marked MAINS L (Red) and the Neutral marked MAINS N (Blue) on the main connector block.
Measure the voltage across the room thermostat connection marked MAINS SwL (Brown) and the Neutral marked MAINS N (Blue) on the main connector block.
GRAVITY DHW SYSTEM
Measure the voltage across the room thermostat connection marked MAINS L (Red) and the Neutral marked MAINS N (Blue) on the main connector block.

Isolate as per TOPs P4
and refit as necessary