Set Appliance State:
Mains Power Off
CH Demand
Boiler On/Off Switch On
| WARNING! Mains voltage is expected during test, follow TOPs P4 live testing procedure |
Measurement:
Measure the voltage at connector CN1 bottom connection (brown wire) on the control PCB and a suitable neutral.

Isolate as per TOPs P4
and refit as necessary