Set Appliance State:
CH Demand
Isolate Mains Power to appliance as per TOPs P4
Insert a link between the mains connector and the pump live at the main terminal block
Insert a link between the mains connector and the pump live at the main terminal block
| WARNING! Mains voltage is expected during test, follow TOPs P4 live testing procedure |
Observation:
Does the pump now run?
If the pump has started to run does the appliance now operate?
If the pump has started to run does the appliance now operate?