Set Appliance State:
Mains Power Off
Boiler Thermostat set to its '0' position
HW Demand
HW Demand
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Measurement:
Measure the voltage across the HW external control connection marked SWL (L) (Brown) and the Neutral marked MAINS (N) (Blue) on the main connector block.

Isolate as per TOPs P4
and refit as necessary