Set Appliance State:

Mains Power Off
Set Multimeter to AC Volts Set meter to measure AC Volts
WARNING! Mains voltage is expected during test, follow TOPs P4 live testing procedure
Mains Power On

Observation:

Ensure there is no demand for heating.
Measure voltage across the tip of the spark electrode and the earth terminal on the electrode.
Expected voltage approximately 190V AC.