Set Appliance State:

Isolate Mains Power to appliance as per TOPs P4
Set Multimeter to AC Volts Set meter to measure AC Volts

Observation:

Apply heating demand.
After approximately 13 seconds voltage should be present at test points. Measure the voltage across the violet leads pin 4 and pin 9 on connector marked J6 on the PCB.