Set Appliance State:
Mains Power Off
Gas Off
| WARNING! Mains voltage is expected during test, follow TOPs P4 live testing procedure |
Measurement:
Apply heating demand, allow fan to start.
After 12 seconds voltage should be present at test points. Measure voltage across the black (neutral) pin 5 and red (live) pin 6 on connector J6 on the PCB.
Expected voltage approximately 200V DC.
Voltage will only be present for approximately 4 seconds during the ignition phase the appliance will try to ignite a maximum of 5 times before going to lockout.
After 12 seconds voltage should be present at test points. Measure voltage across the black (neutral) pin 5 and red (live) pin 6 on connector J6 on the PCB.
Expected voltage approximately 200V DC.
Voltage will only be present for approximately 4 seconds during the ignition phase the appliance will try to ignite a maximum of 5 times before going to lockout.

Isolate as per TOPs P4
and refit as necessary