Set Appliance State:

Set Boiler Control Thermostat to MAX position
Set Multimeter to AC Volts Set meter to measure AC Volts
CH Demand
Isolate Mains Power to appliance as per TOPs P4
Ensure external control are calling for heat
Use insulation mat as required
WARNING! Mains voltage is expected during test, follow TOPs P4 live testing procedure
Mains Power On

Measurement:

Allow the boiler to ignite and run.
Wait until it has shut down prematurely.
Measure the voltage across the switched live connection (marked SwL, red wire) and the neutral connection (marked N, blue wire) at the terminal block.
Mains voltage expected.