Set Appliance State:

Set Boiler Control Thermostat to MAX position
Set Multimeter to DC Volts Set meter to measure DC Volts
CH Demand
Isolate Mains Power to appliance as per TOPs P4
Ensure external controls are calling for heat
Use insulation mat as required
WARNING! Mains voltage is expected during test, follow TOPs P4 live testing procedure
Mains Power On

Measurement:

Allow the pilot to ignite and sparking cease.
Measure the voltage between the terminals with the red wire and white wire at connector PL3 on the PCB.
Expected voltage greater than 175 Vdc.