Set Appliance State:
| Isolate Mains Power to appliance as per TOPs P4 |
CH Demand
Gain access to PCB (use Insulation Mat as required)
Ensure that the Boiler Thermostat is set to MAX
Ensure that the Boiler Thermostat is set to MAX
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Measurement:
Measure the voltage across the two red wires on the PCB connector marked CON 2.

Isolate as per TOPs P4
and refit as necessary