Set Appliance State:
Mains Power Off
Set Boiler Control Thermostat to MAX position
CH Demand
External controls calling for heat
| WARNING! Mains voltage is expected during test, follow TOPs P4 live testing procedure |
Observation:
Allow the boiler to ignite and run. Wait until it shuts down prematurely.
When the boiler shuts down does it go to lockout?
Note:
If the boiler goes to lockout then the red neon on the control panel will illuminate and the reset button on the control panel must be pressed before the appliance will next run.
When the boiler shuts down does it go to lockout?
Note:
If the boiler goes to lockout then the red neon on the control panel will illuminate and the reset button on the control panel must be pressed before the appliance will next run.