Set Appliance State:
Mains Power Off
Set Boiler Control Thermostat to MAX position
CH Demand
Ensure external control are calling for heat
Use insulation mat as required
Use insulation mat as required
| WARNING! Mains voltage is expected during test, follow TOPs P4 live testing procedure |
Measurement:
Measure the voltage across the two terminals with purple wires on connector PL3 at the PCB.
Mains voltage expected.
Mains voltage expected.

Isolate as per TOPs P4
and refit as necessary