Set Appliance State:

Isolate Mains Power to appliance as per TOPs P4
Set Multimeter to AC Volts Set meter to measure AC Volts
For access behind the control panel
Release the fixing screw located at the top of the case front panel and lift the panel
upwards from its locating pins and then forwards from the boiler. Remove the two fixing
screws that secure the control panel and lower the panel.
For access to the control panel components
Remove the five screws securing the rear cover and careful raise the cover from the
control panel. When replacing the cover ensure no wires are trapped and all the wiring
is secured secure with screws previously removed do not over tighten.
WARNING! - Mains voltage is expected during test follow
TOPs P4 live testing procedure
Mains Power On

Measurement:

Reset lockout as necessary.
Boiler switch to On.
All heating controls calling for heat.
Measure voltage across the terminals marked SW.LIVE (red wire) and the terminal marked N (blue wire).
Expected voltage mains voltage (230 volts AC).