Set Appliance State:

Gas Off
Isolate Mains Power to appliance as per TOPs P4
Set Multimeter to AC Volts Set meter to measure AC Volts
CH Demand
WARNING! - Mains voltage is expected during test follow
TOPs P4 live testing procedure
Mains Power On

Measurement:

Boiler switch On.
Reset lockout as necessary.
Allow fan to run after approximately 8 seconds.
Measure voltages across connections 22 (black lead) and connection 23 (orange lead) on connector marked X7 on the PCB.
Expected voltage mains voltage (230 volts AC).