Set Appliance State:
| Isolate Mains Power to appliance as per TOPs P4 |
Remove connector marked X11 from the PCB
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Measurement:
Reset lockout as necessary.
Boiler switch to On.
Measure voltage across the pink leads on the connector.
Expected voltage approximately 24 volts AC.
Boiler switch to On.
Measure voltage across the pink leads on the connector.
Expected voltage approximately 24 volts AC.

Isolate as per TOPs P4
and refit as necessary