Set Appliance State:
Isolate Mains Power to appliance as per TOPs P4
Measurement:
Remove the Black spaded wire and the White spaded wire from the Main Solenoid on the Gas Valve.
Measure the resistance across the Solenoid.
The Resistance across the Solenoid should be approximately 2.1kOhms.
Measure the resistance across the Solenoid.
The Resistance across the Solenoid should be approximately 2.1kOhms.

Isolate as per TOPs P4
and refit as necessary