Set Appliance State:
Isolate Mains Power to appliance as per TOPs P4
Remove the Spark Electrode lead and Electrode from the boiler.
Remove the Spark Electrode lead and Electrode from the boiler.
Measurement:
Confirm Electrode lead and Electrode are in good condition.
Carry out a resistance check of the spark Electrode and lead.
Carry out a resistance check of the spark Electrode and lead.

Isolate as per TOPs P4
and refit as necessary