Set Appliance State:

Set Multimeter to AC Voltage Set meter to measure AC Volts
CH Demand
Use Insulation Mat as required
Isolate Mains Power to appliance as per TOPs P4
Mode Switch in LOW position
Gain access to PCB
WARNING! Mains voltage is expected during test, follow TOPs P4 live testing procedure
Mains Power On

Measurement:

Measure the Voltage across the connection marked 6 (Orange wire) on connector PL5 and the connection marked MAINS(N) (Blue wire) on the main connector block.