Set Appliance State:
Gas Off
CH Demand
Use Insulation Mat as required
Isolate Mains Power to appliance as per TOPs P4
Gain access to boiler terminal block
Gain access to boiler terminal block
| WARNING! Mains voltage is expected during test, follow TOPs P4 live testing procedure |
Measurement:
With the Fan running measure Mains Voltage across the Brown wire connection marked L1 on the PCB connector and the Blue wire connection marked N (connection1) on the main connector block.

Isolate as per TOPs P4
and refit as necessary