Set Appliance State:
| Isolate Mains Power to appliance as per TOPs P4 |
CH Demand
Gain access to PCB (use Insulation Mat as required)
| WARNING! Mains voltage is expected during test, follow TOPs P4 live testing procedure |
Measurement:
Measure the voltage from the brown wire in the 8 way plug on the PCB to a suitable earth point.
Mains voltage should be present.
Voltage will only be present during the sparking phase of the ignition sequence.
Note:
Ensure a good connection is made to avoid misdiagnosis.
Mains voltage should be present.
Voltage will only be present during the sparking phase of the ignition sequence.
Note:
Ensure a good connection is made to avoid misdiagnosis.

Isolate as per TOPs P4
and refit as necessary