Set Appliance State:
| Isolate Mains Power to appliance as per TOPs P4 |
CH Demand
Gain access to PCB (use Insulation Mat as required)
Gain access to terminal strip as necessary
Gain access to terminal strip as necessary
| WARNING! Mains voltage is expected during test, follow TOPs P4 live testing procedure |
Measurement:
Measure the voltage to earth at the SWL connection on the boilers main terminal strip.
Expect mains voltage.
Expect mains voltage.

Isolate as per TOPs P4
and refit as necessary