Set Appliance State:
Mains Power Off
CH Demand
CH temperature control to max
Ensure boiler is cool
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Observation:
Reset appliance, press and hold the reset button until the chimney
sweep button led flashes rapidly, then release the reset button.
Does the boiler reset?
Note:
1. If after boiler reset the fault code changes from the original to a different fault code, then CLICK HERE.
2. If the fault code is a recurring issue, then choose boiler resets to carry out further tests.
sweep button led flashes rapidly, then release the reset button.
Does the boiler reset?
Note:
1. If after boiler reset the fault code changes from the original to a different fault code, then CLICK HERE.
2. If the fault code is a recurring issue, then choose boiler resets to carry out further tests.