Set Appliance State:

Isolate Mains Power to appliance as per TOPs P4
Set Multimeter to AC Volts Set meter to measure AC Volts
CH Demand
CH temperature control to max
Gain access to PCB (use Insulation Mat as required)
WARNING! - Mains voltage is expected during test follow
TOPs P4 live testing procedure
Mains Power On

Measurement:

Reset boiler if required.
Measure for A/C voltage across resistor R115 (as illustrated) and a suitable earth connection.
Allow boiler to start ignition sequence, does the voltage measured reduce to approximately 88 volts A/C when the burner is heard to ignite?
Note.
1. The burner may only ignite for a few seconds, then ignition starts again.
2. The boiler will go to ignition lockout (3 red flashes) after 5 attempts to ignite, reset boiler as required.