Set Appliance State:
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Measurement:
Measure the voltage between pin 5 (red) and pin 6 (black)
at LV2 on the PCB.
Voltage should be approximately 5V DC.
Is the voltage measured as expected?
at LV2 on the PCB.
Voltage should be approximately 5V DC.
Is the voltage measured as expected?

Isolate as per TOPs P4
and refit as necessary