Set Appliance State:
| Isolate Mains Power to appliance as per TOPs P4 |
Gain access to PCB (use Insulation Mat as required)
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Measurement:
Measure the voltage between in 5 (brown) and pin 6 (blue) at HV1 on the PCB within 13 seconds of powering on the appliance and during its self-check.
Mains voltage expected.
If it is not possible to turn the power on to the appliance and measure the voltage within 13s (for example distant fused spur) then it can be activated by entering the installer mode and accessing level 6 - t3.
(click here for information on how to do this)
Set to ON to activate the pump then carry out the test.
Is mains voltage present?
Note:
When the result is confirmed remember to set the test menu for the pump back to OFF.
Mains voltage expected.
If it is not possible to turn the power on to the appliance and measure the voltage within 13s (for example distant fused spur) then it can be activated by entering the installer mode and accessing level 6 - t3.
(click here for information on how to do this)
Set to ON to activate the pump then carry out the test.
Is mains voltage present?
Note:
When the result is confirmed remember to set the test menu for the pump back to OFF.