Set Appliance State:
CH Demand
CH temperature control to max
Ensure boiler is cool
Gas On
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Observation:
Reset boiler if required, wait 10 seconds after power is reinstated, press and hold reset button for 5 seconds, then release.