Set Appliance State:

CH Demand
CH temperature control to max
Ensure boiler is cool
Gas On
WARNING! - Mains voltage is expected during test follow
TOPs P4 live testing procedure
Mains Power On

Observation:

Reset boiler if required, wait 10 seconds after power is reinstated, press and hold reset button for 5 seconds, then release.