Set Appliance State:

CH Demand
CH Temperature control to MAX
WARNING! - Mains voltage is expected during test follow
TOPs P4 live testing procedure
Mains Power On

Observation:

Allow the boiler to ignite and run on central heating, is the heating operating satisfactorily?
Monitor the pressure to check that it does not rise excessively as the system heats.