Set Appliance State:
| Isolate Mains Power to appliance as per TOPs P4 |
CH Demand
Gain access to PCB (use Insulation Mat as required)
CH Temperature control set to MAX
CH Temperature control set to MAX
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Measurement:
Reset boiler as necessary and allow the appliance to complete its self check.
During the sparking stage of the ignition sequence,
measure the voltage between pin 8 (blue) and
pin 9 (orange) on connector HV2 at the PCB.
Mains voltage expected.
Note:
The boiler will attempt to light 5 times before going to lockout, with 30 seconds between each attempt.
During the sparking stage of the ignition sequence,
measure the voltage between pin 8 (blue) and
pin 9 (orange) on connector HV2 at the PCB.
Mains voltage expected.
Note:
The boiler will attempt to light 5 times before going to lockout, with 30 seconds between each attempt.

Isolate as per TOPs P4
and refit as necessary