Set Appliance State:

Isolate Mains Power to appliance as per TOPs P4
Set Multimeter to AC Volts Set meter to measure AC Volts
Gain access to PCB (use Insulation Mat as required)
WARNING! - Mains voltage is expected during test follow
TOPs P4 live testing procedure
Mains Power On

Observation:

Reset boiler as necessary and allow boiler to complete its self-check.
Activate test t1 in boiler settings.
Click here for information on setting boiler test modes.
Measure the voltage across pin 1 (red) and pin 2 (blue)
on connector HV2 at the PCB.
Mains voltage expected.
Note:
Once the test begins voltage will be present for approx 2½ minutes.
It make take up to 10 seconds after activating t1 for the test to start.