Set Appliance State:
| Isolate Mains Power to appliance as per TOPs P4 |
Gain access to the installer connections panel of the PCB
Replace damaged fuse
Replace damaged fuse
Observation:
Measure the resistance between L and N on the leftmost connector of the boiler's installation connections.
Expect greater than 1M Ohm.
Expect greater than 1M Ohm.
