Set Appliance State:
| Isolate Mains Power to appliance as per TOPs P4 |
Ensure there is no demand for either CH or DHW
Gain access to the boilers main terminal strip
Gain access to the boilers main terminal strip
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Measurement:
Measure the voltage between terminal marked "sL" to the "MAINS IN" N connection at the terminal strip.
With no demand mains voltage should be absent.
With no demand mains voltage should be absent.

Isolate as per TOPs P4
and refit as necessary