Set Appliance State:

Isolate Mains Power to appliance as per TOPs P4
DHW Demand
Remove fan connector from the PCB
WARNING! - Mains voltage is expected during test follow
TOPs P4 live testing procedure
Mains Power On

Observation:

Reset lockout as necessary.
Does the boiler now recognise a demand?