Welcome to the XSol Diagnostic System
This system provides interactive diagnostic tests with proper sequence navigation based on the decoded .seq file logic.
IDEAL ICOS HE/ELISE
GLOBALLY REPLACED
IDEAL ICOS HE/ELISE
BOILER FRONT
POWER UP
{ONOFFSWITCHON}
NO DEMANDS
BURNER IGNITES AND ESTABLISHES DHW DEMAND
{ONOFFSWITCHON}
FAN RUNS
{ONOFFSWITCHON}
DISPLAY REACTS TO DEMAND
{ONOFFSWITCHON}
OPERATION CH
BOILER THERMOSTAT SET TO MAX
DOES BOILER REACT TO CH DEMAND
{ONOFFSWITCHON}
BOILER ENTERS STANDBY CORRECTLY
{ONOFFSWITCHON}
ENSURE NO DEMANDS
H3/H5 INVESTIGATION
OK TO BE BLANK
HB OR LB
OK TO BE BLANK
DASH/DOT
OK TO BE BLANK
LITE DIAGNOSTIC
DIAGNOSIS RELIES ON
QUICK ACCESS DATA AND INFORMATION
THE TABLE BELOW SHOW
HEADER FOR QADAI FLOW THERMISTOR
INTENTIONALLY BLANK-HEADER FOR QADAI
HEADER FOR QADAI FLUE SENSOR
INTENTIONALLY BLANK-HEADER FOR QADAI
HEADER FOR QADAI GAS VALVE RESISTANCE
INTENTIONALLY BLANK-HEADER FOR QADAI
HEADER FOR QADAI GAS VALVE VOLTAGE
INTENTIONALLY BLANK-HEADER FOR QADAI
HEADER FOR QADAI FAN RESISTANCE
INTENTIONALLY BLANK-HEADER FOR QADAI
BURNER IGNITES BUT BAFFLES
TRAP AND SEAL
DASH/DOT FAULT CODE
USER CONTROLS
BURNER BAFFLES
HEAT EXCHANGER PRIMARY
BAFFLES OR LIFTS OFF
BURNER INJECTOR
CALIBBRATION
THERMISTOR - BOILER CONTROL
FAN NOT RUNNING
DRY FIRE SENSOR
BURNER IGNITES BUT DOES NOT ESTABLISH
GAS PRESSURE INLET
FAN DOES NOT RUN
DRY FIRE SENSOR
FAN DOES NOT RUN
THERMISTOR - BOILER CONTROL
SPARKING NOT LIGHTING
BURNER
BOCKED OR DAMAGED SPARKING OCCURS BURNER DOESNOT IGNITE
BURNER INJECTOR
BLOWN STANDBY MODE AT POWER UP WITH DISPLAY BOARD
FUSE MAIN PCB
ON/OFF SWITCH WITH HARNESS
MAINS SWITCH
POWER UP BLANK DISPLAY
PCB AND FAN
NO DISPLAY
PCB AND FAN
POWER UP FAN RUNS WITH DEMAND AT POWER UP
USER CONTROLS
BLANK DISPLAY FAN RUNS
USER CONTROLS
STOPPING DEMAND
FAN
STOPPING FAN DEMAND
HARNESS MAIN
FAN DAMAGED PCB
PCB AND FAN
FAN DAMAGED PCB 2
PCB AND FAN
FAN DAMAGED PCB 3
PCB AND FAN
FAN DAMAGED PCB 4
PCB AND FAN
BURNER BAFFLES OUT
BURNER
FAN DOES NOT RUN 1
HARNESS - FAN
FAN DOES NOT RUN 3
HARNESS - FAN
NO PERMANENT POWER TO FAN
HARNESS - FAN
NO POWER TO FAN
HARNESS - FAN
BLOWN STAND BY MODE AT POWER UP WITH DISPLAY BOARD
MAIN FUSE FUSED SPUR F1
LE FAULT CODE
SENSORS
NEW MODELDAMAGED
ELECTRODE - IGNITION
NEW MODELDAMAGED
LEAD - IGNITION
NO SPARKING
ELECTRODE - IGNITION
NO SPARKING
LEAD - IGNITION
BURNER DOES NOT IGNITE
GAS VALVE
FAN RUNS NO SPARK 2
HARNESS MAIN
FAN RUNS NO SPARK 3
HARNESS MAIN
H1 INVESTIGATION2
THERMISTOR - BOILER CONTROL
OVERHEAT INVESTIGATION
DRY FIRE SENSOR
BLANK FOR LITE DIAGNOSTIC
Z DIRECTION
BLANK FOR QADAI
Z DIRECTION
QADAI
THERMISTOR - BOILER CONTROL
QADAI
DRY FIRE SENSOR
QADAI
GAS VALVE
QADAI 2
FAN
CASE REMOVAL
DIRECTION CHOICE OR CONTINUE
BOILER TEMP LOW SYSTEM TEMP LOW
GAS PRESSURE INLET
CH CONTROL
USER CONTROLS
JUMPER SETTINGS
PCB JUMPER SETTINGS
BURNER INJECTOR
BURNER INJECTOR
LE AND HE INVESTIGATION
THERMOSTAT - OVERHEAT
LE HE INVESTIGATION
ELECTRODE - FLAME DETECTION
HE LE INVESTIGATION
LEAD DETECTION
FAN RUNS
DRY FIRE SENSOR
FOR TYPE DIAG PROCEDURE
DIRECTION CHOICE OR CONTINUE
OVERHEAT INVESTIGATION
THERMOSTAT - OVERHEAT
NOT FILLED AND VENTED
SYSTEM CHECKS
BOILER TEMP LOW SYSTEM TEMP LOW
TRAP AND SEAL
FUSE BLOWING
GAS VALVE
H1 INVESTIGATION
THERMISTOR - BOILER CONTROL
BOILER TEMP LOW SYST TEMP LOW
THERMISTOR - BOILER CONTROL
BOILER NOISY
THERMISTOR - BOILER CONTROL
FOR FAULT CODES PAGE
DIRECTION CHOICE OR CONTINUE
OVERHEAT INVESTIGATION
THERMISTOR - BOILER CONTROL
OUT OF CALIBRATION
THERMOSTAT - OVERHEAT
OVERHEATING WHEN NOT
DRY FIRE SENSOR
NOISY
SYSTEM CHECKS
BOILER HOT RADS COLD
SYSTEM CHECKS
FROST PROTECTION
FROST PROTECTION
H5 INVESTIGATION
PCB JUMPER SETTINGS
BOILER TEMP LOW SYSTEM TEMP LOW
PCB JUMPER SETTINGS
BOILER TEMP LOW SYSTEM TEMP LOW
BURNER INJECTOR
BURNER IGNITES BUT IS NOISY
IMPULSE TUBE
FROST PROTECTION
THERMISTOR - BOILER CONTROL
OVERHEAT
OVERHEAT
BURNER ESTABLISHES THEN BAFFLES
GAS PRESSURE INLET
BURNERIGNITES
LEAD DETECTION
BURNER IGNITES
ELECTRODE - FLAME DETECTION
BURNER DOES NOT ESTABLISH
TRAP AND SEAL
DOES NOT ESTABLISH
HEAT EXCHANGER PRIMARY
NOT ESTABLISHING
BURNER INJECTOR
OVERHEATING
USER CONTROLS
FUSE BLOWING 2
GAS VALVE
OPERATION OK BUT BOILER OVERHEATS
THERMOSTAT - OVERHEAT
PCB FUSE BLOWN FOR MAINS
PCB FUSE BLOWN FOR MAINS
FAN RUNS
THERMOSTAT - OVERHEAT
PCB GAS VALVE
PCB GAS VALVE
NO DROP IN GAS PRESSURE
IMPULSE TUBE
POOR SUPPLY
GAS PRESSURE INLET
BLOCKED OR DAMAGED
TRAP AND SEAL
NO FAN PRESSURE
BURNER INJECTOR
BLOCKED OR DAMAGED
BURNER
FAN RUNS BURNER NOT IGNITE
ELECTRODE - IGNITION
SPARKING NOT LIGHTING
GAS PRESSURE INLET
BURNER BAFFLES OUT
FLUE
HB OR LB FAULT CODE
USER CONTROLS
BOILER DOES NOT REACT TO DHW DEMAND
HARNESS MAIN
FAN DOES NOT RUN
HARNESS MAIN
FAN DOES NOT RUN 2
HARNESS MAIN
FAN
FAN
FAN DOES NOT RUN
FAN
FURTHER INVESTIGATION F1 WITH DISPLAY BOARD
Z DIRECTION
FAN DOES NOT RUN 4
HARNESS MAIN
FAN DOES NOT RUN 5
HARNESS MAIN
INCORRECT MIX
GAS VALVE
NO SWITCHED LIVE AT START UP
HARNESS MAIN
FURTHER IN VESTIGATION F2 WITH DISPLAY BOARD
Z DIRECTION
NO DISPLAY
USER CONTROLS
BLANK DISPLAY
USER CONTROLS
BLANK DISPLAY
PCB
DISPLAY BOARD FURTHER INVESTIGATION
DIRECTION CHOICE OR CONTINUE
FURTHER INVESTIGATE DISPLAY BOARD PROBLEM
DIRECTION CHOICE OR CONTINUE
FAN DOES NOT RUN
PCB
NO POWER TO FAN
PCB
WRONG MIX
GAS VALVE
SPARK GENERATOR
SPARK GENERATOR
NO SPARKING 2
PCB - PRIMARY CONTROLS & SPARK GENERATOR
NO SPARKING
SPARK GENERATOR
FUSE FURTHER INVESTIGATION 1
HARNESS - FAN
FUSE FURTHER INVESTIGATION 2
HARNESS - FAN
POWER UP BLANK DISPLAY
HARNESS - FAN
BLANK DISPLAY
HARNESS - FAN
FAN RUNS NO SPARK
HARNESS MAIN
NO SPARKING
PCB - PRIMARY CONTROLS & SPARK GENERATOR
H1 INVESTIGATION2
HARNESS MAIN
OVERHEAT INVESTIGATION 2
HARNESS MAIN
SENSOR TEMP FLOW
RESULT AS EXPECTED
SENSOR FLUE TEMP
RESULT AS EXPECTED
GAS VALVE
RESULT AS EXPECTED
VOLTAGE AT GAS VALVE
RESULT AS EXPECTED
FAN RESISTANCE
RESULT AS EXPECTED
CH OPERATION NOISY
HEAT EXCHANGER PRIMARY
HE LE FAULT CODE
PCB
H1 INVESTIGATION
PCB
H4 INVESTIGATION
PCB
PCB FUSE BLOWN
PCB FUSE BLOWN
H1 INVESTIGATION
HARNESS MAIN
FUSE FURTHER INVESTIGATION
HARNESS MAIN
H4 INVESTIGATION
HARNESS MAIN
LE AND HE INVESTIGATION
HARNESS MAIN
OVERHEAT INVESTIGATION 3
HARNESS MAIN
NO MAINS POWER INTO PCB
HARNESS MAIN
BOILER NOISY
PUMP
H5 INVESTIGATION
PCB
FROST PROTECTION
PCB
FROST PROTECTION
HARNESS MAIN
FLAME SENSE
PCB
FUSE FURTHER INVESTIGATION 3
HARNESS MAIN
BLANK FOR OVERHEAT STAT REPLACEMENT OR INVESTIGATION
DIRECTION CHOICE OR CONTINUE
NO POWER TO GAS VALVE
HARNESS MAIN
FAN RUNS SPARKING BUT NOT IGNITING
HARNESS MAIN
SPARKING OCCURS BURNER DOES NOT LIGHT
GAS VALVE
NO FAN PRESSURE
HEAT EXCHANGER PRIMARY
BOILER NOISY
CHARACTERISTIC TEST FROM OPERATION CH
BOILER UP TO TEMPERATURE BUT RADIATORS TOO COOL
CHARACTERISTIC TEST FROM OPERATION CH
BOILER AND SYSTEM TEMPERATURE TOO LOW
CHARACTERISTIC TEST FROM OPERATION CH
OPERATION SATISFACTORY BUT BOILER GOES TO OVER HEAT
CHARACTERISTIC TEST FROM OPERATION CH
OPERATION SATISFACTORY AND SYSTEM REACHES TEMP BUT GETS TOO COOL BEFORE REFIRING
CHARACTERISTIC TEST FROM OPERATION CH
TEMP DIFF CORRECT LOCAL BOILING
CHARACTERISTIC TEST FROM TEMPERATURE DIFFERENTIAL FLOW RETURN (P=DIF NOK NOISY NSD)
DIFFERENTIAL OK
CHARACTERISTIC TEST FROM TEMPERATURE DIFFERENTIAL FLOW RETURN (P=DIF NOK NOISY NSD)
BURNER DOES NOT IGNITE
CHARACTERISTIC TEST FROM FAN RUNS BURNER IGNITES AND ESTABLISHES CH DEMAND
BURNER CAN BE HEARD TO IGNITE BUT DOES NOT ESTABLISH
CHARACTERISTIC TEST FROM FAN RUNS BURNER IGNITES AND ESTABLISHES CH DEMAND
PRESSURE DOES NOT REACH 2MB
CHARACTERISTIC TEST FROM PRESSURE GAS BURNER
PRESSURE REACHES 2MB BUT DOES NOT DROP WHEN VOLTAGE PRESENT
CHARACTERISTIC TEST FROM PRESSURE GAS BURNER
BURNER IGNITES AND ESTABLISHES THEN BAFFLES OR IS NOISY
CHARACTERISTIC TEST FROM FAN RUNS BURNER IGNITES AND ESTABLISHES CH DEMAND
08/08/2022 13:16:54 2205_1_50_1 21/11/2022 09:10:27
09/11/2022 13:23:13
INSPECTION DISPLAY PCB CONNECTIONS
REMOVE THE DISPLAY PCB
VOLTAGE PERMANENT - HALL SENSOR
ON/OFF SWITCH ON
NO DEMANDS
RESISTANCE FAN HARNESS
DISCONNECT THE CONNECTOR FROM THE FAN
DISCONNECT THE FAN HARNESS CONNECTOR FROM THE PCB
RESISTANCE SENSOR TEMP PRIMARY AND HARNESS
DISCONNECT CONNECTOR TO THE PRIMARY SENSOR AND OVERHEAT SENSOR
RESISTANCE SENSOR TEMP PRIMARY
REMOVE THE TWO RED LEADS FROM THE PRIMARY SENSOR
RESISTANCE SENSOR FLUE OVERHEAT SENSOR
REMOVE THE CONNECTOR FROM THE OVERHEAT SENSOR
RESISTANCE FAN HARNESS
DISCONNECT THE CONNECTOR FROM THE FAN
DISCONNECT THE FAN HARNESS CONNECTOR FROM THE PCB
RESISTANCE SENSOR TEMP PRIMARY AND HARNESS
DISCONNECT CONNECTOR TO THE PRIMARY SENSOR AND OVERHEAT SENSOR
RESISTANCE SENSOR TEMP PRIMARY
REMOVE THE TWO RED LEADS FROM THE PRIMARY SENSOR
RESISTANCE SENSOR FLUE OVERHEAT SENSOR
REMOVE THE CONNECTOR FROM THE OVERHEAT SENSOR
VOLTAGE DISPLAY BOARD (AT CONTROL PCB)
{ONOFFSWITCHON}
DISCONNECT USER CONTROL FROM THE MAIN PCB
RESISTANCE FAN & HARNESS
REMOVE FAN CONNECTOR FROM THE PCB
RESISTANCE OF THE FAN
DISCONNECT THE HARNESS FROM FAN
RESISTANCE FAN & HARNESS
REMOVE FAN CONNECTOR FROM THE PCB
RESISTANCE OF THE FAN
DISCONNECT THE HARNESS FROM FAN
VOLTAGE DISPLAY BOARD (AT CONTROL PCB)
{ONOFFSWITCHON}
DISCONNECT USER CONTROL FROM THE MAIN PCB
VOLTAGE AT SPARK GENERATOR
USE INSULATION MAT AS REQUIRED
RESISTANCE SPARK GENERATOR HARNESS
REMOVE SPARK GENERATOR CONNECTOR FROM THE PCB
RESISTANCE GAS VALVE SOLENOID MAIN AND HARNESS - BLUE
REMOVE GAS VALVE CONNECTOR FROM THE PCB
RESISTANCE GAS VALVE SOLENOID MAIN
REMOVE THE LEADS FROM THE GAS VALVE.
RESISTANCE SENSOR TEMP PRIMARY
REMOVE THE TWO RED LEADS FROM THE PRIMARY SENSOR
RESISTANCE SENSOR FLUE OVERHEAT SENSOR
REMOVE THE CONNECTOR FROM THE OVERHEAT SENSOR
RESISTANCE SENSOR TEMP PRIMARY
REMOVE THE TWO RED LEADS FROM THE PRIMARY SENSOR
RESISTANCE SENSOR FLUE OVERHEAT SENSOR
REMOVE THE CONNECTOR FROM THE OVERHEAT SENSOR
RESISTANCE GAS VALVE SOLENOID MAIN
REMOVE THE LEADS FROM THE GAS VALVE.
VOLTAGE GAS VALVE (AT VALVE)
{ONOFFSWITCHON}
RESISTANCE FAN
DISCONNECT THE FAN CONNECTOR FROM THE FAN
VOLTAGE EXTERNAL CONTROLS (IN)
{ONOFFSWITCHON}
GAIN ACCESS TO PCB (USE INSULATION MAT AS NECESSARY)
VOLTAGE PUMP AT PUMP
REMOVE THE COVER FROM THE PUMP
RESISTANCE OVERHEAT STAT AND HARNESS
DISCONNECT THE CONNECTOR TO THE GAS VALVE AND OVERHEAT STAT
RESISTANCE SENSOR OVERHEAT STAT
DISCONNECT THE RED WIRES FROM THE OVERHEAT STAT
RESISTANCE SENSOR TEMP PRIMARY AND HARNESS
DISCONNECT CONNECTOR TO THE PRIMARY SENSOR AND OVERHEAT SENSOR
RESISTANCE SENSOR TEMP PRIMARY
REMOVE THE TWO RED LEADS FROM THE PRIMARY SENSOR
RESISTANCE SENSOR FLUE OVERHEAT (NTC) AND HARNESS
REMOVE THE CONNECTOR FOR THE OVERHEAT SENSOR FROM THE PCB
RESISTANCE SENSOR FLUE OVERHEAT SENSOR
REMOVE THE CONNECTOR FROM THE OVERHEAT SENSOR
VOLTAGE MAINS POWER INTO APPLIANCE FOR POLARITY
GAIN ACCESS TO PCB (USE INSULATION MAT AS NECESSARY)
RESISTANCE GAS VALVE SOLENOID MAIN AND HARNESS_FUSE
REMOVE GAS VALVE CONNECTOR FROM THE PCB
RESISTANCE GAS VALVE SOLENOID MAIN_FUSE
REMOVE THE LEADS FROM THE GAS VALVE.
RESISTANCE FAN
DISCONNECT THE FAN CONNECTOR FROM THE FAN
OBSERVATION DOES THE BOILER RESET
ALLOW THE APPLIANCE TO COOL
RESISTANCE OVERHEAT STAT AND HARNESS
DISCONNECT THE CONNECTOR TO THE GAS VALVE AND OVERHEAT STAT
RESISTANCE SENSOR OVERHEAT STAT
DISCONNECT THE RED WIRES FROM THE OVERHEAT STAT
VOLTAGE PUMP AT PUMP
REMOVE THE COVER FROM THE PUMP
VOLTAGE MAINS POWER INPUT TO APPLIANCE
GAIN ACCESS TO PCB (USE INSULATION MAT AS NECESSARY)
VOLTAGE PUMP AT PUMP
REMOVE THE COVER FROM THE PUMP
TEMPERATURE FROST PROTECTION ACTIVE
ATTACH A TEMPERATURE PROBE TO THE FLOW PIPE
OBSERVATION JUMPER SETTINGS MAIN AND DISPLAY PCB
REMOVE USER DISPLAY PCB
RESISTANCE SENSOR TEMP PRIMARY AND HARNESS
DISCONNECT CONNECTOR TO THE PRIMARY SENSOR AND OVERHEAT SENSOR
RESISTANCE SENSOR TEMP PRIMARY
REMOVE THE TWO RED LEADS FROM THE PRIMARY SENSOR
RESISTANCE FUSE F1 (FUSED SPUR)
REMOVE FUSE FROM FUSED SPUR
RESISTANCE GAS VALVE SOLENOID MAIN AND HARNESS_FUSE
REMOVE GAS VALVE CONNECTOR FROM THE PCB
RESISTANCE GAS VALVE SOLENOID MAIN_FUSE
REMOVE THE LEADS FROM THE GAS VALVE.
RESISTANCE FAN
DISCONNECT THE FAN CONNECTOR FROM THE FAN
VOLTAGE GAS VALVE (AT PCB)
{ONOFFSWITCHON}
GAIN ACCESS TO PCB (USE INSULATION MAT AS NECESSARY)
RESISTANCE OVERHEAT STAT AND HARNESS
DISCONNECT THE CONNECTOR TO THE GAS VALVE AND OVERHEAT STAT
RESISTANCE SENSOR OVERHEAT STAT
DISCONNECT THE RED WIRES FROM THE OVERHEAT STAT
INSPECTION PRIMARY HEAT EXCHANGER
REMOVE BURNER ASSEMBLY
REMOVE SUMP COVER ASSEMBLY
VOLTAGE PERMANENT HALL SENSOR
ON/OFF SWITCH ON
NO DEMANDS
VOLTAGE FAN POWER AT PCB
{ONOFFSWITCHON}
REMOVE THE FAN CONNECTOR FROM THE PCB
RESISTANCE FAN HARNESS
DISCONNECT THE CONNECTOR FROM THE FAN
DISCONNECT THE FAN HARNESS CONNECTOR FROM THE PCB
RESISTANCE SENSOR FLUE OVERHEAT (NTC) AND HARNESS
REMOVE THE CONNECTOR FOR THE OVERHEAT SENSOR FROM THE PCB
VOLTAGE FAN AT PCB
{ONOFFSWITCHON}
G
RESISTANCE FAN HARNESS
DISCONNECT THE CONNECTOR FROM THE FAN
DISCONNECT THE FAN HARNESS CONNECTOR FROM THE PCB
RESISTANCE SENSOR FLUE OVERHEAT (NTC) AND HARNESS
REMOVE THE CONNECTOR FOR THE OVERHEAT SENSOR FROM THE PCB
INSPECTION BURNER
REMOVE THE BURNER
RESISTANCE FUSE F2 ( APPLIANCE)
REMOVE FUSE HOLDER FROM PCB
RESISTANCE ON/OFF SWITCH AND HARNESS
LOWER THE PCB
REM
VOLTAGE AT MAIN PCB
ON/OFF SWITCH ON
DISCONNECT USER CONTROL FROM THE MAIN PCB
VOLTAGE AT MAIN PCB
ON/OFF SWITCH ON
DISCONNECT USER CONTROL FROM THE MAIN PCB
FURTHER INVESTIGATION DISPLAY BOARD PROBLEM
TESTS SO FAR INDICAT
FURTHER INVESTIGATION DISPLAY BOARD PROBLEM
TESTS SO FAR INDICAT
OBSERVATION DISCONNECT FAN - DEMAND RECOGNISED?
REMOVE CONNECTOR FROM FAN ASSEMBLY AND MAKE SAFE
OBSERVATION DISCONNECT FAN HARNESS - DEMAND RECOGNISED?
REMOVE FAN CONNECTOR FROM THE PCB
RESISTANCE FAN
DISCONNECT THE FAN CONNECTOR FROM THE FAN
RESISTANCE FAN
DISCONNECT THE FAN CONNECTOR FROM THE FAN
RESISTANCE FAN
DISCONNECT THE FAN CONNECTOR FROM THE FAN
RESISTANCE FAN
DISCONNECT THE FAN CONNECTOR FROM THE FAN
INSPECTION BURNER
REMOVE THE BURNER
RESISTANCE ELECTRODE SPARK
UNPLUG ELECTRODE FROM HT LEAD
RESISTANCE ELECTRODE SPARK HARNESS
REMOVE SPARK HARNESS FROM ELECTRODE AND SPARK GENERATOR
RESISTANCE SPARK GENERATOR HARNESS - BLUE
REMOVE SPARK GENERATOR CONNECTOR FROM THE PCB
RESISTANCE ELECTRODE SPARK HARNESS
REMOVE SPARK HARNESS FROM ELECTRODE AND SPARK GENERATOR
RESISTANCE SENSOR TEMP PRIMARY AND HARNESS
DISCONNECT CONNECTOR TO THE PRIMARY SENSOR AND OVERHEAT SENSOR
RESISTANCE SENSOR FLUE OVERHEAT (NTC) AND HARNESS
REMOVE THE CONNECTOR FOR THE OVERHEAT SENSOR FROM THE PCB
PRESSURE GAS INLET
ATTACH PRESSURE GAUGE TO THE INLET PRESSURE TEST POINT
OBSERVATION DOES BOILER CONTINUE TO SHOW DEMAND
{ONOFFSWITCHON}
RESISTANCE SENSOR TEMP PRIMARY
REMOVE THE TWO RED LEADS FROM THE PRIMARY SENSOR
RESISTANCE SENSOR TEMP PRIMARY
REMOVE THE TWO RED LEADS FROM THE PRIMARY SENSOR
RESISTANCE ELECTRODE SENSE HARNESS
DISCONNECT FLAME SENSE LEAD FROM ELECTRODE
DISCONNECT FLAME SENSE LEAD FROM THE PCB
RESISTANCE ELECTRODE SENSE
REMOVE FLAME SENSE ELECTRODE FROM HEAT EXCHANGER
RESISTANCE FAN AND HARNESS
DISCONNECT THE FAN HARNESS CONNECTOR FROM THE PCB
VOLTAGE MAINS POWER AT CONNECTOR BLOCK
{ONOFFSWITCHON}
GAIN ACCESS TO TERMINAL BLOCK
OBSERVATION DOES OVERHEAT RE OCCUR
BOILER THERMOSTAT SET TO MAX
RESISTANCE SENSOR TEMP PRIMARY
REMOVE THE TWO RED LEADS FROM THE PRIMARY SENSOR
RESISTANCE OVERHEAT SENSOR FLUE OR HEAT EX AT TEMP AND HARNESS
RUN THE APPLIANCE UNTIL THE BURNER SHUTS DOWN
FAN RUNS
{ONOFFSWITCHON}
VOLTAGE EXTERNAL CONTROLS (IN)
{ONOFFSWITCHON}
GAIN ACCESS TO PCB (USE INSULATION MAT AS NECESSARY)
INSPECTION IMPULSE TUBE
REMOVE IMPULSE TUBE FROM GAS VALVE AND BOILER CHASSIS
PRESSURE GAS INLET
ATTACH PRESSURE GAUGE TO THE INLET PRESSURE TEST POINT
RESISTANCE ELECTRODE SENSE HARNESS
DISCONNECT FLAME SENSE LEAD FROM ELECTRODE
DISCONNECT FLAME SENSE LEAD FROM THE PCB
RESISTANCE ELECTRODE SENSE
REMOVE FLAME SENSE ELECTRODE FROM HEAT EXCHANGER
INSPECTION PRIMARY HEAT EXCHANGER
REMOVE BURNER ASSEMBLY
REMOVE SUMP COVER ASSEMBLY
INSPECTION BURNER
REMOVE THE BURNER
OBSERVATION ANTI CYCLE DELAY
{ONOFFSWITCHON}
BOILER STAT SET TO 1/3 POSITION
RESISTANCE FAN AND HARNESS
DISCONNECT THE FAN HARNESS CONNECTOR FROM THE PCB
OBSERVATION DISCONNECT MAINS TERMINAL BLOCK FUSE BLOW AGAIN
DISCONNECT THE APPLIANCE MAINS CONNECTOR
REPLACE THE MAINS FUSE
OVERHEAT THERMOSTAT FURTHER INVESTIGATION
TESTS SO FAR INDICAT
OBSERVATION SPARKING
REMOVE THE ELECTRODE
VOLTAGE GAS VALVE (AT VALVE)
{ONOFFSWITCHON}
PRESSURE GAS BURNER
CONNECT A U-GAUGE TO THE BURNER GAS PRESSURE TEST POINT.
RESISTANCE GAS VALVE SOLENOID MAIN
REMOVE THE LEADS FROM THE GAS VALVE.
PRESSURE GAS INLET
ATTACH PRESSURE GAUGE TO THE INLET PRESSURE TEST POINT
PRESSURE GAS INLET
ATTACH PRESSURE GAUGE TO THE INLET PRESSURE TEST POINT
INSPECTION IMPULSE TUBE
REMOVE IMPULSE TUBE FROM GAS VALVE AND BOILER CHASSIS
PRESSURE GAS INLET
ATTACH PRESSURE GAUGE TO THE INLET PRESSURE TEST POINT
INSPECTION BURNER
REMOVE THE BURNER
RESISTANCE ELECTRODE SPARK
UNPLUG ELECTRODE FROM HT LEAD
RESISTANCE ELECTRODE SPARK
UNPLUG ELECTRODE FROM HT LEAD
REMOVE ELECTRODE FROM HEAT EXCHANGER
VOLTAGE AT SPARK GENERATOR
USE INSULATION MAT AS REQUIRED
System Information
- Total Tests: 403
- Sequence Logic: Decoded from encrypted .seq file
- Navigation: Dynamic based on pass/fail results
- Source: 4731307 GW SWIFTFLOW 100 SIT Control