Set Appliance State:
Mains Power Off
CH Demand
Boiler mains switch On
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Measurement:
Measure voltage across brown lead (live) and pink lead (neutral) at PCB side of inline connector.

Isolate as per TOPs P4
and refit as necessary