Set Appliance State:
Mains Power Off
CH Demand
Boiler mains switch On
Boiler CH thermostat to maximum
Boiler CH thermostat to maximum
Gas On
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Observation:
Allow burner to ignite and the boiler to run for CH.
Is the CH operation satisfactory?
Also monitor the system pressure as the CH warms up.
Is the CH operation satisfactory?
Also monitor the system pressure as the CH warms up.