Set Appliance State:
Gas Off
CH Demand
Isolate Mains Power to appliance as per TOPs P4
Remove ignition electrode and earth lead from combustion chamber and attach to lower L/H side of case
Remove ignition electrode and earth lead from combustion chamber and attach to lower L/H side of case
Measurement:
Test 1:
Check the ignition electrode gap at the tips of the electrode.
Gap between the electrode tips should be 3mm +2mm/-0mm.
Test 2:
Mains Power On
Stand clear of electrode.
Boiler on/off switch ON and allow fan to run and ignition sequence to commence.
After approx. 15 seconds can sparking be seen at the electrode?
Check the ignition electrode gap at the tips of the electrode.
Gap between the electrode tips should be 3mm +2mm/-0mm.
Test 2:
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Stand clear of electrode.
Boiler on/off switch ON and allow fan to run and ignition sequence to commence.
After approx. 15 seconds can sparking be seen at the electrode?