Set Appliance State:
CH Demand
Isolate Mains Power to appliance as per TOPs P4
Boiler on/off switch ON
Gain access to appliance terminal block connections
Boiler on/off switch ON
Gain access to appliance terminal block connections
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Measurement:
Measure voltage across connection L2 and N (neutral).
Note:
If no external controls are fitted a link must be fitted between connections L1 and L2.
Note:
If no external controls are fitted a link must be fitted between connections L1 and L2.

Isolate as per TOPs P4
and refit as necessary