Set Appliance State:
On/Off Switch OFF
Isolate Mains Power to appliance as per TOPs P4
Gain access to PCB connections as necessary
Gain access to PCB connections as necessary
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Measurement:
Appliance On/Off switch On.
Measure voltage across connection 2 (+ve probe to red lead) and connection 1 (-ve probe to black lead) on connector J11 on the control PCB.
Expected voltage approximately 9 volts DC.
Measure voltage across connection 2 (+ve probe to red lead) and connection 1 (-ve probe to black lead) on connector J11 on the control PCB.
Expected voltage approximately 9 volts DC.

Isolate as per TOPs P4
and refit as necessary